Parramatta Light Rail

A 12-kilometre two-way track connecting Westmead to Carlingford via the Parramatta CBD.

Client: CPB Downer Joint Venture Parramatta Connect
Duration: Commenced: June 2020 Completed: Current
Location: Westmead to Carlingford, Sydney, NSW

The Parramatta Light Rail is a 12-kilometre two-way track connecting Westmead to Carlingford via the Parramatta CBD.

The Parramatta Light Rail Coffey Testing is providing site and laboratory testing of soilsconcreteaggregates and specialised rock and soft soils and along with our partners, our scope includes provision for geotechnical engineering, environmental consultancy and testing as well as sonic drilling

Related Projects

Our team successfully managed a multifaceted project that encompassed various critical components for GE Vernova. From ground survey, LiDAR, and geotechnical investigation, we orchestrated seamless coordination to achieve project objectives.
The Coffey Testing – Adelaide team has been contracted for a period of 4-months, to assist with the construction of the a2 wall.
The Coffey Testing team were mobilised to site in early December 2023, with ongoing work until mid-March this year.
The Coffey Testing – Port Hedland Team are conducting a test that consists of a 3.6km rail spur, which will allow the twin access to the MAC train load out.