Melbourne, Victoria

37 Production Drive,
Campbellfield VIC 3061, Australia
Phone:
0429 575 293
Business Hours:
Mon - Fri: 9:00am to 5:00pm
Saturday: Closed
Sunday: Closed

Coffey Testing’s Melbourne Laboratory opened in October, 2022, and services all areas of Victoria.

The laboratory is located North of Melbourne and are willing to travel to service the East and West sides of the state.

A couple of Melbourne’s most notable projects include the ongoing Melbourne Airport Pavement Maintenance Project (MAPMP), and the completed Deer Park Quarry project.

Click the button below to see the wide range of tests that we can facilitate at the Coffey Testing -Melbourne, Victoria branch.
  • Annexure of our Adelaide Base Lab
  • Finish Date: 09 December 2021


The Carrapateena Western Access Road Annex Facility is established from 21 January 2021 until 9 December 2021 for the Carrapateena Western Access Road project for Exact Contracting Services Pty Ltd.

Meet our Laboratory Contact,
Yugraj Singh

Yugraj (Well-known to the team as ‘Raj’) Singh is Coffey Testing’s Laboratory Manager for our Melbourne operations.

With 12 years’ experience in accurately collecting, analysing and modelling physical samples to determine geotechnical properties in digital data to meet quality assurance standards, Raj is a knowledgeable, passionate and committed member to the Coffey Testing team.

Raj says, “My overall career within the space has allowed me to learn on the go, and I find that I am constantly learning everyday within my role as a Laboratory manager, too.

“I love to help clients with their requests, thinking outside the box when it comes to problem solving, and overall enjoy challenging and pushing myself.”

 

Request a Quote






How did you hear about us?:
Lead Industry:
Services Required Timeframe:
Location:
Aggregate Testing:
Concrete Testing:
Pavement Investigation:
Rock Testing:
Level 1 Supervision:
Specialty Testing:
Site/ Lot Classification:
Soil Testing:
Remote Lab/ Site Testing:
Test per unit rate:
Other:
Brief description of project/ testing:

Melbourne, Victoria Projects

The Airport Projects Team are helping to replace over 100 slabs through conducting compaction and DCP testing. This testing allows them to determine the health of the existing material under the slab after excavation.