The Melbourne Airport Pavement Maintenance Project (MAPMP 2.0) is currently coordinated by our Airport Project Team, with Reece O’Connor as Project Manager.
This project commenced in April of this year, and consists of over 100 slabs to be replaced during nightworks. The slab replacements process includes compaction and DCP testing to test the existing material under the slab after excavation.
This is followed by volumetrics pouring in formation where each truck requires testing for consistency, flexural and compressive strength. With the mix being rapid set concrete, it leaves no time for error. The slab must be poured, and the required results achieved in time to re-open the airport to traffic.